Use separate receiving records for each supplier even when the nominal bottle format is the same. Retain the pallet, pack and bottle reference so the quality team can link observations to the received lot. Check equipment handling under its approved procedure.
Compare receiving and machine evidence by supplier
| Lot observation | Equipment or process evidence | Next action |
|---|---|---|
| Supplier A with matching drawing and pack | Recorded entry and observed handling in the approved method. | Retain as a comparison lot. |
| Supplier B, same nominal volume, different neck or base drawing | Actual drawing references and fit at rinser and transfer. | Request a documented handling check before assuming the previous setup applies. |
| Supplier C arrives with a disturbed outer pack | Photos, lot and receiving decision. | Refer the acceptance and treatment decision to quality. |
Tie each result to the supplier and lot
The line needs evidence for the exact bottle and received condition. Ask quality to determine any approved treatment, acceptance or release required. Keep observed handling and cleaning evidence in separate fields.
For a replacement rinser or tooling request include drawings and dimensions by supplier, pallet or pack type and the first transfer that differs from the reference lot.
Read the BottlingScout article on line inspection and acceptance
Send the multi-supplier glass intake record with drawings, lot conditions and the handling check still to confirm.