Treat the first short lot after a machine change as a distinct production event. Agree the actual container, closure, rate and documented settings. Ask who can release the first packs for normal production. Retain samples that show how the changed machine meets the specification.
Use the first lot to close the handover
Record the machine reference and incoming lot before the run. Confirm the site’s setup and startup checks, then take authorised samples after the first stable output and any planned restart. Where a result is still open, identify the held quantity and who decides its disposition.
| Stage | Evidence | Approval |
|---|---|---|
| Setup sign-off | Machine, format and recipe references | ___ |
| First accepted pack | Time, photo and result | ___ |
| Stable running and restart | Accepted output and observed stops | ___ |
| End of lot | Good units, held samples and release | ___ |